Fluid intelligence
Cold production

PCM provides PCP artificial lift systems for oil and gas exploration and production that ensure long life, maximum volume and minimum downtime
PCM Oil & Gas enables you to reduce capital and operational expenditure with one of the widest ranges of Progressive Cavity Pumps (PCP), with their inherent efficiencies, in the industry

Why choose PCM

  • In-house developed elastomer for a longer pump life time
  • Construction is simple and can be adapted to any kind of well head. 
  • Save Surface-mounted Drive system 
  • Precise rotor stator fitting to improve pump efficiency

Applications/processes

  • Onshore oilwell production
  • Offshore oilwell production
  • Well dewatering for CBM production

Downloadables

  • Case study Emeraude – Artificial lift PCP offshore
  • Case study China – Large flowrate Artificial lift PCP
  • Case study Sudan – Study on Artificial Lift Lyfe Cycle costs
  • Case study China – Well dewatering PCP
  • Case study Argentina – Artificial lift PCP in deep wells
  • Case study in Indonesia – Comparison artificial lift PCP, ESP, SRP.
  • Préparation d'acid jam -  LZ50